Honor Award Winners

Golden One Center in Sacramento, CA; AECOM of Orange, CA, in association with Henderson Engineering, Inc., Kansas City, MO

Claude “Bud” Lewis Carlsbad Desalination Plant in Carlsbad, CA; Arcadis U.S., Inc. of Carlsbad, CA

Port of Long Beach, Middle Harbor Redevelopment Program, Phase 1 in Long Beach, CA; Arcadis U.S., Inc. of Los Angeles, CA

Central Marin Ferry Connection Multi-Use Pathway in Larkspur, CA; Biggs Cardosa Associates, Inc. of San Jose, CA

Tustin Avenue / Rose Drive Railroad Grade Separation in Placentia and Anaheim, CA; Biggs Cardosa Associates, Inc. of Orange, CA

Tehachapi Renewable Transmission Project 500kV Underground Transmission Mira Loma-Vincent in Chino Hills, CA.; Burns & McDonnell Engineering Co., Inc. of Brea, CA

Healdsburg Avenue Bridge over the Russian River in Healdsburg, CA; Cornerstone Structural Engineering Group, Inc. of Fresno, CA

Foothill Gold Line from Pasadena to Asuza, CA; Hill International of Irvine, CA

Closed Lincoln Landfill Groundwater Corrective Action Project in Lincoln, CA; Holdrege & Kull Consulting Engineers and Geologists of Chico, CA

Converting Waste to Vehicle Fuel at the City of San Mateo Wastewater Treatment Plant in San Mateo, CA; Kennedy/Jenks Consultants of San Francisco, CA

Harry Tracy Water Treatment Plant (HTWTP) Long Term Improvements Project (LTIP) – 11MG Treated Water Reservoir in San Bruno, CA; Kennedy/Jenks Consultants of San Francisco, CA

Padre Dam Municipal Water District’s Advanced Water Purification Demonstration Project in Santee, CA; Kennedy/Jenks Consultants of San Diego, CA, and Trussell Technologies, Inc. of San Diego, CA

Blue Line Light Rail Transit  Renewal Project in San Diego, CA; Kimley-Horn and Associates, Inc. of San Diego, CA

Interstate 80 SMART Corridor Project – Integrated Corridor Mobility (ICM) in San Francisco – Oakland, CA; Kimley-Horn and Associates, Inc. of Oakland, CA, and Mott MacDonald of Pleasanton, CA

San Jose – Santa Clara RWF 3D Scanning, 3D Modeling & Mapping in San José, CA; Kjeldsen, Sinnock & Neudeck, Inc. (KSN) of Stockton, CA

Cross Border Xpress Terminal Building and Pedestrian Skybridge in San Diego, CA; Kleinfelder of San Diego, CA

Auto Center Drive Grade Separation Project in Corona, CA; Kleinfelder | Simon Wong Engineering of San Diego, CA

Los Angeles County Metropolitan Transportation Authority Division 13 Bus Operations and Maintenance Facility in Los Angeles, CA; Maintenance Design Group, LLC (MDG) of Pasadena, CA